Elwha project and Glines project : HEP analysis and wildlife mitigation plan
(Book)
Published
[Bellevue, WA?], 1990.
Format
Book
Status
Port Angeles - Archives
ARCH 333.914 HOSEY_A
1 available
ARCH 333.914 HOSEY_A
1 available
Copies
Location | Call Number | Status |
---|---|---|
Port Angeles - Archives | ARCH 333.914 HOSEY_A | Non-circulating |
Description
Loading Description...
Also in this Series
Checking series information...
More Details
Published
[Bellevue, WA?], 1990.
Language
English
Notes
General Note
"April 16, 1990" - cover.
Description
The Elwha studies filed on May 27, 1988 as part of the relicensing procedure for the Glines Canyon and Elwha Hydroelectric Projects provided information on wildlife and vegetation in the Elwha River watershed. Section VIII, entitled Terrestrial Resources, provided results of the HEP analysis of pre-project and with-project conditions. Additionally, a conceptual mitigation plan for the lands owned by James River II, Inc. (James River) surrounding Lake Aldwell was presented. This report has been prepared to address FERCS's Request for Additional Information .